ICF New Build House - Full Groundworks Package
Client: Private client. Timescale: 8 weeks. Globe Civil Engineering were appointed to deliver the full groundworks package for a private new build insulated concrete frame (ICF)…
Read the case study

Recent groundworks, roads, sewers and fencing packages delivered across East Anglia and the Southeast.

Client: Private client. Timescale: 8 weeks. Globe Civil Engineering were appointed to deliver the full groundworks package for a private new build insulated concrete frame (ICF)…
Read the case study

Client: Private client. Timescale: 6-week programme. Globe Civil Engineering Ltd were appointed by a private client to deliver the groundworks for the conversion of an existing…
Read the case study

Client: Coulson Building Group. Timescale: 2-week programme (delivered in 9 days). Globe Civil Engineering Ltd were appointed by Coulson Building Group to deliver the substructure…
Read the case study

A 400sqm bus holding area in Newham rebuilt in jointless surfacing with red bays, completed in four to five days against six to seven weeks for jointed concrete.
Read the case study

Approximately 1,000sqm of jointless fuel resistant surfacing to Stand 50 at Gatwick North Terminal, reopened to aircraft 24 hours after laying.
Read the case study

3,000sqm internal new build and 200sqm external refurbishment at the Waitrose National Distribution Centre in Bracknell, designed for 100kN rack leg loads.
Read the case study

Grouted macadam refurbishment of 5,500sqm at Arriva's Thurmaston bus depot in Leicester, delivered in four phases while the depot stayed operational.
Read the case study

2,600sqm of internal and external jointless surfacing at a new build waste recycling facility in King's Lynn, designed for forklift buckets scraping the surface.
Read the case study
Tell us about the scheme and we will come back to you with a considered price and a realistic programme.