Get a quote
01223 910888 enquiries@theglobegroup.co.uk
Experienced in

Road Construction

Professional Road and Sewer Construction

Globe Civil Engineering delivers estate roads, adopted sewers and drainage infrastructure for housing and commercial developments across East Anglia and the Southeast. Our packages are built to adoption standards from the outset - designed around the agreements and approvals that get a development from completion to handover without delay.

For a developer, roads and sewers are where adoption risk lives. Get the standards, the inspections and the paperwork right and the scheme adopts cleanly. Get them wrong and handover stalls. We work to the former.

What we deliver

Our roads and sewers packages cover estate roads built to adoptable standards - sub-base, binder and surface courses, kerb lines, footways and shared surfaces - along with adopted foul and surface water sewers to water authority specification, including connections to existing networks. We install the full drainage infrastructure of gullies, manholes, chambers, attenuation and pumping stations where required, integrate SuDS schemes from design through to handover, and deliver the works aligned to S38, S104 and S278 agreements.

On yards, depots and hardstandings that take heavier punishment than a standard road build up, we can finish in jointless grouted macadam instead of concrete or asphalt.

The detail that matters at procurement

We build to adoption standards throughout, not as an afterthought, so the road and sewer networks pass inspection and adopt without rework. We work to the requirements of Section 38 (road adoption), Section 104 (sewer adoption) and Section 278 (works to the existing highway), coordinating directly with local highways authorities and water undertakers. Formation sign-offs, sub-base compaction testing and staged inspections are documented so the adoption process runs smoothly, and we sequence the roads and drainage around the groundworks, plot construction and the overall site programme.

How we work

Each scheme is delivered against a defined programme and signed off at each stage. We coordinate directly with highways authorities and water undertakers, manage the inspection regime, and keep the records that the adopting bodies require. Works are delivered under site-specific RAMS by trained, certificated operatives.

Accreditations

CHAS, CITB and UK Power Networks accredited. CPCS and NPORS certified operators. All works under site-specific RAMS.

Part of the Globe Group

As part of The Globe Group, our roads and sewers package sits alongside groundworks, scaffolding (Globe Cambridge) and roofing (Globe Roofing). On a multi-package delivery, that means one group coordinating the infrastructure, the substructure and the trades above it - keeping the wider site programme aligned and accountability in one place.

Get your roads and sewers package priced

Need estate roads, drainage or adoptable sewers priced for a development? Talk to the team about your scheme and programme.

Roads and Sewers questions answered

Capabilities

What our roads and sewers package covers

roads-b

01 / 02

Roads

  • Construction of Estate & Link Roads
  • Cut & Fill Operations
  • Surface Treatments
  • Lamp Columns & Street Furniture
  • Mains Service Trenching
  • All Testing & Compliance Regime
drainage-2

02 / 02

Drainage

  • Main Line Sewerage Systems
  • Rising Mains
  • Open Cut Systems
  • Working in Existing Highways & Adopted Roads
  • Adopted Sewerage Connections
  • Pumping Stations

Projects

Related work

ICF New Build House - Full Groundworks Package

ICF New Build House - Full Groundworks Package

Client: Private client. Timescale: 8 weeks. Globe Civil Engineering were appointed to deliver the full groundworks package for a private new build insulated concrete frame (ICF)…

Read the case study

Agricultural Building Conversion - Raft Foundation

Agricultural Building Conversion - Raft Foundation

Client: Private client. Timescale: 6-week programme. Globe Civil Engineering Ltd were appointed by a private client to deliver the groundworks for the conversion of an existing…

Read the case study

Cricket Pavilion Substructure - Thriplow

Cricket Pavilion Substructure - Thriplow

Client: Coulson Building Group. Timescale: 2-week programme (delivered in 9 days). Globe Civil Engineering Ltd were appointed by Coulson Building Group to deliver the substructure…

Read the case study

Insight

More on roads and sewers

Need a price for a roads and sewers package?

Tell us about the scheme and we will come back to you with a considered price and a realistic programme.

Contact Us