Arriva bus depot resurfacing, Thurmaston
Case study

Arriva Bus Depot, Thurmaston, Leicester

Client: Arriva Fox County Ltd. Project: 5,500sqm external refurbishment, 2001. Main contractor: Civil and Industrial Products Ltd. Subcontractor: Jarvis Highway Maintenance Ltd. Engineers: MD Prosser Associates.

Overview

Arriva Fox County Ltd, one of the UK's leading bus operators, specified grouted macadam to refurbish their bus depot at Thurmaston in Leicester in 2001. The depot is busy and heavily trafficked by buses and lorries, being shared with a transport company.

The requirement

The existing concrete slab had badly deteriorated. There were many undulations, and areas that had completely broken up needed reconstructing to the full depth of the existing construction. The depot had to keep running throughout.

Engineers MD Prosser Associates approached CIP about the system after receiving technical literature on it.

Why grouted macadam

The options were restricted. A complete new concrete slab meant digging out and disposing of the existing surface, then at least seven days of curing before the area could be trafficked, which would have caused significant disruption to depot operations.

An asphalt overlay would have been quicker than either concrete or grouted macadam, but asphalt would not deliver the resistance to rutting, the durability or the fuel resistance the depot needed.

Grouted macadam gave a fast programme with minimal disruption, a fuel resistant and jointless surface, and 24 hour curing, in a pavement specification that would not rut or deform under continuous bus and lorry movements.

Design and specification

For the overlay areas the proposal was to plane off to tie in with existing levels, crack and seat the existing concrete slab, regulate as required to take out undulations, then overlay.

Cracking and seating matters when overlaying concrete. The dominant character of the material is the microsilica cementitious grout, and its performance characteristics are those of a higher specification concrete. Overlaying directly onto a rigid slab without de-stressing it risks reflective cracking, so the existing surface is cracked and seated to transform it into a semi flexible base.

The reconstruction areas, around 900sqm across six patches, were dug out down to the sub base, recompacted and built back up with a heavy duty macadam basecourse and the surfacing on top.

Installation

The works were carried out in four phases to allow the client to keep operating, and were completed in one continuous visit to site. The overall programme from start to finish was three weeks.

Outcome

The depot remained operational throughout. The programme advantages were significant for an operating site, and the surface has performed well since installation.

Buses at the Thurmaston depot after resurfacing
Buses at the Thurmaston depot after resurfacing
The depot yard, showing the completed overlay
The depot yard, showing the completed overlay
A double decker standing on the finished surface
A double decker standing on the finished surface

Photographs from the original CIP project records. The system was supplied under the Densiphalt name at the time of these works and is now supplied as Confalt through Contec. This was a CIP installation, and the grouted macadam contracting capability now sits with Globe Civil Engineering.

More work

Other projects

ICF New Build House - Full Groundworks Package

ICF New Build House - Full Groundworks Package

Client: Private client. Timescale: 8 weeks. Globe Civil Engineering were appointed to deliver the full groundworks package for a private new build insulated concrete frame (ICF)…

Read the case study

Agricultural Building Conversion - Raft Foundation

Agricultural Building Conversion - Raft Foundation

Client: Private client. Timescale: 6-week programme. Globe Civil Engineering Ltd were appointed by a private client to deliver the groundworks for the conversion of an existing…

Read the case study

Cricket Pavilion Substructure - Thriplow

Cricket Pavilion Substructure - Thriplow

Client: Coulson Building Group. Timescale: 2-week programme (delivered in 9 days). Globe Civil Engineering Ltd were appointed by Coulson Building Group to deliver the substructure…

Read the case study

Looking for a quality and affordable contractor for your next project?

Tell us about the scheme and we will come back to you with a considered price and a realistic programme.

Contact Us